Rijon Saha, Sweety Akter, & Hasi Rani Sarker. (2022). Improvement of the Line Efficiency of a T-Shirt Manufacturing Unit Using Eight Waste of Lean Tool. Journal of Science & Technology (JST), 7(2), 346–354. https://doi.org/10.46243/jst.2022.v7.i02.pp346-354